In 2023 we brought the news that Fastned were coming to Northern Ireland. Yesterday, they opened their new state-of-the-art facilities at Banbridge.
With a prime position on our strategic road network, and ultra-rapid charging speeds, this hub will provide a super-fast boost for travellers on the route between Belfast and Dublin. Charging is by 6x 400kW dual sided Alpitronic chargers, providing 12 x CCS connectors plus 2 Chademo leads as well.

With 12 pull-through bays and the iconic Fastned solar canopy, this site brings a massive boost to the charging provision along the key Belfast to Dublin corridor. The flexibility of this layout was shown when Derry Group turned up with an HGV cab which was able to park and charge without blocking other bays.

Each charger has a tap to pay terminal (74p/kWh at time of writing). A pre-authorisation of £40 is applied until your charge completes. This works in well for Irish users who’s cards are limited to €50 on tap to pay. A receipt is available via your phone using a QR code at the end of your charge. Payment can also be made through third parties such as Electroverse, Elli, Allstar and Paua.

The site is well lit, covered by CCTV and local amenities include an adjacent Starbucks and KFC, with plenty of shops and cafés available in the main Boulevard Outlet next door.

Fastned’s second site at the Junction Shopping Complex in Antrim is now due to open in March. We’d like to say a big thanks to all the staff pictured below from Fastned for making this a reality. Kudos also goes out to M&M Contractors who did such a high quality job with the site’s construction.


One response
Great resource….& well laid out. I was able to use my CircleK charge card without issue. Top speed was a disappointing 80Kwh with a low (& preheated) battery. I’ve seen 207 on Ionity. Hopefully this ramps up.